Last week, the Barbour Consulting outside media team was busy installing 400 Amp Generator connection points and associated switchgear to facilitate backup power for the large customer-facing advertising and train information screens throughout the station.
Working within a Transport for London train station is highly regulated, with every stage of the work scrutinised and health and safety strictly enforced. However, this is no issue for our experienced team, as we have years of experience working in such environments. The Barbour standard SOP ensures every project we undertake adheres to the highest safety and quality standards.
Despite the challenging environment, our team completed the work on time and within budget. The client was happy, and there were no disruptions to the general public’s access to the crucial train information they needed, just in time for the Bank Holiday getaway.
In addition to installing the generator connection points, our team also managed the integration of the new system with the existing infrastructure, ensuring seamless operation and reliability. The installation included detailed testing and commissioning to guarantee that the backup power system would activate flawlessly in case of a primary power failure, providing uninterrupted service to the station’s critical information systems.
At Barbour Consulting, we pride ourselves on our ability to deliver complex projects in challenging environments without compromising on quality or safety. Our commitment to excellence and customer satisfaction drives us to continually exceed expectations.
For all your generator and power needs, trust Barbour Consulting to deliver solutions that meet the highest standards of quality and reliability. Contact us today to learn more about how we can support your critical infrastructure projects.