In Düsseldorf, one of our clients experienced a substantial water leak from the offices above, which damaged their HV/LV transformer, putting critical infrastructure at risk. Responding swiftly, we mobilised our engineering team to the site within 4 hours, diagnosing the problem and ensuring the site’s generator immediately took over the load, preventing any disruptions to operations.

Over the past two weeks, we’ve maintained a constant presence on-site, with engineers monitoring the generator 24/7 to ensure its reliable performance while the transformer was out of commission. During this time, we procured a new HV transformer from the UK, delivering it to Düsseldorf and positioning it for installation.

Our installation team completed the setup of the new transformer earlier this week, with preparations now in place for our HV specialists to test and commission it in the coming days. This will restore full power redundancy, ensuring the client’s system is fully protected and operational.

At Barbour Consulting, we understand the critical nature of power systems and the importance of rapid response. Our dedicated team is always ready to take decisive action, ensuring our clients’ operations continue smoothly, even in the face of unexpected challenges. Whether it’s emergency support, swift procurement, or 24/7 monitoring, we’re committed to delivering high-quality solutions for mission-critical environments.

More resources

  • Handling Complex Projects with Confidence: How the Barbour Team Delivers

    Read more →

  • Why This Black Forest Power Upgrade Shows the Value of Preparation

    Read more →

  • UK-Built Generators Ready for European Deployment

    Read more →

  • Is Your Infrastructure Ready for Black Friday Traffic Surges?

    Read more →

Get a personal consultation