It was a long day in the Black Forest, but exactly the kind of project we thrive on. Our team carried out a full generator replacement, removing an ageing 20KVA unit and installing a new 60KVA generator with a Deep Sea control system – a serious step up in both performance and reliability.

The upgrade included a complete rework of the fuel and exhaust system, ensuring full compliance with site requirements and European standards. Once the mechanical side was complete, our engineers performed the final software configuration and testing, making sure the new control panel was perfectly calibrated before handover.

By the end of the day, the site had a fully operational, UK-built generator ready to protect critical systems whenever needed.

No surprises. No delays. Every potential issue was identified and mitigated before the first bolt was turned. It’s the kind of smooth, risk-free execution our customers have come to expect and demand from every Barbour project.

Whether it’s a remote repeater site in Germany or a data facility closer to home, we deliver dependable power solutions that perform when it matters most.

More resources

  • Why This Black Forest Power Upgrade Shows the Value of Preparation

    Read more →

  • UK-Built Generators Ready for European Deployment

    Read more →

  • Is Your Infrastructure Ready for Black Friday Traffic Surges?

    Read more →

  • Large-Scale Cooling Installations: Designed, Delivered, and Maintained by Experts

    Read more →

Get a personal consultation