When backup power fails in a hospital, every second counts. This week, our team completed a rapid control panel upgrade on one of the generators supporting a major London hospital.

After surveying the issue, we designed and installed a new main control panel, rewired the engine loom, and commissioned a DeepSea 7420 controller, providing advanced and reliable control of the entire system.

Once installed, we ran full function and load tests, logging and analysing all alternator outputs before signing off. The new system is now fully operational and ready to take critical load at a moment’s notice.

From fault to fix, we delivered the full solution in under one week. A clear example of how Barbour responds to critical power challenges quickly and without compromise.

Need support with your backup power? Chat to our team today.

More resources

  • Handling Complex Projects with Confidence: How the Barbour Team Delivers

    Read more →

  • Why This Black Forest Power Upgrade Shows the Value of Preparation

    Read more →

  • UK-Built Generators Ready for European Deployment

    Read more →

  • Is Your Infrastructure Ready for Black Friday Traffic Surges?

    Read more →

Get a personal consultation